Culvert Scoping
The foundation of every great culvert is meticulous planning Success begins with the details
Project Name
ELR - Milage
Date Scoped
Duration (minutes)
1
120
Surveyor Name
What3Words
Nearest Road/Access Point
Access Considerations
3rd Party Access - Residential
3rd Party Access - Farmers Field
3rd Party Access - Business
Steep/Rough Terrain
Poor Underfoot Conditions
Vegetation & Obstructions
Long Distance From Access
Accessibility For Vehicles
Road Access - Public A and B Roads
Road Access - Single Track Roads
Access via Agricultural Land
Access via Rights of Way
Access via Byways
Gator Required?
Yes
Possibly - Weather Dependant
No
Determined Access Route
Temporary Access Requirements
Landowner Permission
Environmental Permits
Local Authority Permission
Trackway or Ground Protection Mats
Traffic Management
Culvert Reference Number
Culvert Barrel Size (mm)
Culvert Diameter/Height (mm)
Culvert Width
Depth Of Water
Flow Rate
No Flow
Trickle Flow
Slow Flow
Moderate Flow
High Flow
Full Flow
urging Flow (or Overcapacity)
Culvert Length (mm)
Material Type
Brick Colour
Brick Type
Brick Size
Brick Bond Pattern
Brickwork Required
Yes
No
Brick Singles
Yes
No
Patch Pointing
Yes
No
Closure Size - Quants
Brick On Edge Size - Quants
Vegetation Clearance Required?
Yes
No
Area Of Vegetation Clearance Required (m2)
Type Of Vegetation To Clear
Grasses
Shrubs
Aquatic Plants
Herbs and Wildflowers
Trees
Mosses and Ground Cover
Invasive Species
Tree Removal Required
Yes
No
TPO On Trees
Tree Girth
Tree Height (m)
Ecological Considerations
Confirmed Machine Capacity (Pressure & Flow Rate)
Tanker Required
Yes
No
Porta Wheel Required
Yes
No
Confirmed Water Source
Debris Collection System
Sediment Traps
Silt Fences
Debris Screens
Mesh Grates
Wet-Dry Vacuum Trucks
Hydro-Vac Trucks
Sediment Filter Bags
Dewatering Bags
Debris and Sediment Traps
Disposal Plan For Collected Debris
Disposal Off Site
Hazardous Waste Disposal
Donate to existing environment
TM Set Up (If Required)
CCTV Unit Required
Yes
No
On Site Communication
Two-Way Radios
Mobile Phones
Type Of Damming Required
Position Silt Curtains Or Barriers Downstream
TW Damming Required
Yes
No
Safe Access And Egress For Operatives?
Yes
No
Number Of Dams Required
Length Of Handrail - Headwall (m)
Length Of Wing Walls- Headwall (m)
Number Of Runs
Handrail Locations
Head Wall
Wing Walls
Fixing Method
Dug In
Top Fixed
Angle Of Wingwalls (Degrees)
Confined Space Required
Yes
No
Trade
Bricklayer
Steelworker
Multi Skilled
General Labourer
Duration (days)
Heli Bar Length (mm)
Quant Of Heli Bar
Location Of Stitching
Excavation Type
Hand
Machine
Location Of Excavation Required
Excavated Material Disposal Required
Yes
No
Quants Of Material To Be Disposed (m3)
Comments And Observations
Cost - Vegetation Clearance
Photo Upload
Drag and Drop (or)
Choose Files
Send Message